2027 IREC Changes
- #6 shear pins, at least 4 (maybe 6?)
- Do the actual math on drag separation forces and force generated, instead of just using what has worked in the past
- Single separation, dual deploy system with tender descenders
- We need to figure out a lines diagram and do lots and lots of subscale testing for this, Cooper is willing to fly L3 at SOD in September/October
- Chute bag
- SRAD ballistic drogue
- SRAD nose cone
- Payload in nose cone
- Motor assembled way before we go to IREC, need copies of closures and casing (last years?)