Skip to main content
2027 IREC Changes
- #6 shear pins, at least 4 (maybe 6?)
- Do the actual math on drag separation forces and force generated, instead of just using what has worked in the past
- Tighter shear pin holes with thread engagement.
- Research vent holes in recovery tubes
- What size, how many, do the math on what effect it has and how much we need it.
- Test Single separation, dual deploy system with tender descenders
- Chute bag VS SRAD Nomex
- SRAD ballistic drogue
- SRAD nose cone
- Conical VS VK
- Laid up VS filament wound
- Payload in nose cone
- Motor assembled way before we go to IREC, need copies of closures and casing (last years?)
- Test RC2 and RC3+ flight computers with charge authority.
- Better setup of recovery wiring
- Thread retaining bolts and shear pins into bulkheads