2027 IREC Changes
- #6 shear pins, at least 4 (maybe 6?)
- Do the actual math on drag separation forces and force generated, instead of just using what has worked in the past
- Tighter shear pin holes with thread engagement.
- We need to figure out a lines diagram and do lots and lots of subscale testing for this, Cooper is willing to fly L3 at SOD in September/October (Sasha L3 ASAP)
Test RC2 and RC3+ flight computers with charge authority. Better setup of recovery wiring