Advanced Search
Search Results
25 total results found
6/27 ERP meeting
Part naming, $ represents incrementing digit: SRAD General: YR_0$$$$$_A COTS General: COTS_0$$$$$ SRAD Team General: YR_10$$$$_A COTS Team General: COTS_10$$$$ SRAD Team: YR_123$$$_A COTS Team: COTS_123$$$ YR is next year starting June 28th of each year, so Ju...
Wiki Usage
Making a private page
By default, all pages made on the Rockets Wiki are public. If you want to make a page private follow these steps:
2027 IREC Changes
Better CAD #6 shear pins, at least 4 (maybe 6?) Do the actual math on drag separation forces and force generated, instead of just using what has worked in the past Tighter shear pin holes with thread engagement. Intentional thread engagement, not in all tubes ...
Recovery
Shear Pin Retention Strategy
We want a way to retain shear pins that both will not fail and is easy to use. At IREC 2026, we failed in part because the tape that was holding the pins in came out, and because the holes were drilled too large for the pins. We want to thread the shear pins i...